Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Abbasian Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis, Unpublished PhD Thesis, , North Carolina State University.

Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control, Unpublished PhD Thesis, , North Carolina State University.

  • Type: Thesis
  • Keywords: population; integration; construction project
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303937068
  • Abstract:
    Cost and schedule control have been an important area of research. However, though a majority of construction projects employ some method of cost and schedule control, still, many projects suffer from ineffective control due to inefficient flow of information. Additionally, the problem is magnified by the difficulty in controlling data due to the limited time available to commit to this task and the lack of the proper organization, use, and management of data, coupled with inefficient manual data collection methods. Therefore, a solution to these problems imposes the challenges of integrating cost and schedule control and controlling the quality, integrity, and timeliness of data. To address these challenges, automated methods for acquiring, storing, and using the data in support of integrated control are needed. One mechanism to assist in effectively doing so is a database management system (DBMS). The difficulty, however, is that the proper organization, use, and management of data requires that it be well modeled. Unfortunately, engineering data models are almost universally developed in an ad hoc manner. Therefore, there is a fundamental need for using a formal, methodological approach to modeling data; in this case cost and schedule data. Given the development, evaluation, and adoption of a formal method for structuring engineering databases, two additional problems remain which are incorporated into the scope of this dissertation. The first problem is that of populating the database with data. Such population must occur as efficiently and quickly as possible. Automated data acquisition capabilities, effectively coupled with the database in the domain of interest, must be explored. The second problem is that of using the data in the database. The database should contain data that directly and efficiently supports processing needs and engineering applications that are essential and appropriate in the domain of interest. The data collection mechanisms, the database structure, and the data must all satisfy specified needs. This dissertation suggests that one form of effective integration can be achieved by linking data collection, data representation, and data use in an automated fashion.

Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions, Unpublished PhD Thesis, , North Carolina State University.

Alsharef, A F A (2022) Leveraging data analytics to improve construction operations and occupational safety, Unpublished PhD Thesis, , North Carolina State University.

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions, Unpublished PhD Thesis, , North Carolina State University.

Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction, Unpublished PhD Thesis, , North Carolina State University.

Bai, Y (1996) Planning and control model for robotic bridge painting, Unpublished PhD Thesis, , North Carolina State University.

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes, Unpublished PhD Thesis, , North Carolina State University.

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices, Unpublished PhD Thesis, , North Carolina State University.

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning, Unpublished PhD Thesis, , North Carolina State University.

Choi, B (2003) Topics in risk-based design and performance evaluation of structures, Unpublished PhD Thesis, , North Carolina State University.

Dorr, E E (1979) Economies of scale in high school construction and operation, Unpublished PhD Thesis, , North Carolina State University.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects, Unpublished PhD Thesis, , North Carolina State University.

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems, Unpublished PhD Thesis, , North Carolina State University.

Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems, Unpublished PhD Thesis, , North Carolina State University.

Kranz, C N (2021) Optimizing compost incorporation for stormwater infiltration, runoff quality, and vegetation establishment in post-construction soils, Unpublished PhD Thesis, , North Carolina State University.

Lee, D (2023) Development of a real-time automated mobile robotic welding system in construction, Unpublished PhD Thesis, , North Carolina State University.

Lee, J (2005) Value analysis of Wi-Fi agent functions in construction, Unpublished PhD Thesis, , North Carolina State University.

Namian, M (2017) Factors affecting construction hazard recognition and safety risk perception, Unpublished PhD Thesis, , North Carolina State University.

Noghabaei, M (2021) Visual and behavioral data analysis in immersive virtual environments for enhancing construction safety, planning, and control, Unpublished PhD Thesis, , North Carolina State University.

Nuntasunti, S (2004) The effects of visual-based information logistics in construction, Unpublished PhD Thesis, , North Carolina State University.

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry, Unpublished PhD Thesis, , North Carolina State University.

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards, Unpublished PhD Thesis, , North Carolina State University.

Rihani, R A (2006) An investigation of critical success factors for robotic masonry, Unpublished PhD Thesis, , North Carolina State University.

Russell, M M (2013) Allocation of time buffer to construction project task durations, Unpublished PhD Thesis, , North Carolina State University.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry, Unpublished PhD Thesis, , North Carolina State University.

Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks, Unpublished PhD Thesis, , North Carolina State University.

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology, Unpublished PhD Thesis, , North Carolina State University.